Home  /  Granny flats

Granny flats, built to add space or income.

A granny flat can add room for family, or a separate rental dwelling on your existing block. Empolo Group manages design, approval and construction of self-contained secondary dwellings across Sydney.

391094C Licensed Builder · NSW
Scope

What a granny flat build with us includes

Every site is different, so your written quote itemises exactly what applies. A typical scope covers:

How It Works

From site assessment to handover.

01

Site assessment & feasibility

We check your block against the Housing SEPP's lot size, setback and access requirements.

02

Design to SEPP requirements

Floor plan designed to meet floor area caps, setbacks and parking requirements for secondary dwellings.

03

Written, itemised quote

Scope broken down by stage, with inclusions, exclusions, provisional sums and a payment schedule.

04

Build

Staged from site set-up through structure, services, fit-out and finishes.

05

Handover & certification

Final inspections, certification and a clean handover with full documentation.

Before You Start

Good to know before you start

Housing SEPP. Secondary dwellings are governed by the NSW Housing SEPP — floor area, height, setback and parking rules apply, and eligibility depends on your lot size and zoning. We check this against your site before design begins.

Title. A granny flat generally can't be sold separately from the main dwelling — it doesn't subdivide the same way a duplex can. Confirm current rules for your situation if this matters to your plans.

Insurance and contracts. Residential work over $20,000 requires Home Building Compensation (HBC) insurance. Contracts over $7,500 must be in writing, and a deposit can't exceed 10% of the contract price.

Questions

Granny flat FAQs

What's the difference between a granny flat and a duplex?

A granny flat is a secondary dwelling on the same title as your main home, built under the Housing SEPP. A duplex is typically two separately titled dwellings. See our duplex page for that option.

Can I rent it out?

Generally yes, subject to your council's and the Housing SEPP's requirements — this is a common reason people build one. We can talk through what applies to your property.

What's the minimum block size?

This depends on your zoning and council's controls under the Housing SEPP. We'll check your site's eligibility before any design work begins.

How long does approval take?

Where a site qualifies for Complying Development, approval can be faster than a full Development Application — but timeframes still vary. We'll confirm the likely pathway and timeframe for your site.

Do you manage the whole process?

Yes — site assessment, design to meet SEPP requirements, the approval pathway, and construction through to handover.

Considering a granny flat?

Tell us about your block and what you're after. We'll check feasibility and follow up with a written, itemised quote.